The challenges
Supernova Factory intends to change the location of its office. They plan to move to a new one where there is no information on infrastructure cabling. The company is looking for a complete solution, which will include: inspection and measurement of the cabling in the office, installation of a rack, construction of an internal network, power supply, option to run a second line afterwards.
-
The challenge of relocation is that it should actually happen in less than 24 hours. The old office stops working in the morning, and the new one starts at the end of the same day!
-
Supernova Factory is conducting its own research to select a partner with which to carry out the technical work. The customer contacts Neterra with specific conditions, one of which is that the work process does not interrupt during the relocation.
-
Neterra's team mobilized in a flash. First, collects information from the client and recognizes his technical needs and requirements. Second, inspects the place, describes, and tests the internal wiring, measures the Wi-Fi coverage. Based on the audit and requirements, the team prepares a technical solution which includes required devices to ensure 100% coverage. After that checks the wiring and makes an installation plan.